Mts Acumen Electrodynamic Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Hardware Mts Acumen Electrodynamic herunter. MTS Acumen Electrodynamic User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - 100-265-565 A be certain

MTS Acumen™ Electrodynamic Test SystemLoad Frame Site Preparation Guide100-265-565 A be certain.

Seite 2

Caution notices indicate the presence of a hazard with a low level of risk which, ifignored, could cause moderate or minor personal injury or equipmen

Seite 3 - Contents

IntroductionTopics:•Introduction ...

Seite 4 - Additional Considerations 39

IntroductionMTS Acumen Electrodynamic Material Test Systems are designed to operate in a laboratory or light industryenvironment. These systems are no

Seite 5 - Technical Support

ResponsibilitiesTopics:•Customer Responsibilities...

Seite 6

Customer ResponsibilitiesIt is the customer's responsibility to have the facility ready to install the system and move the system to itsfinal tes

Seite 7 - If You Contact MTS by Phone

It is the customer's responsibility to provide suitable lifting and moving devices such as an overhead craneand forklift. MTS supplies hoist ring

Seite 8

Initial Operation and TrainingOnce the installation is complete, MTS performs an initial operation of the load frame and a calibration checkto ensure

Seite 9 - Documentation Conventions

Site PreparationTopics:•Site Preparation...

Seite 10

Site PreparationThis section describes the physical, electrical, and mechanical requirements that must be considered beforeinstalling the MTS Acumen T

Seite 11 - Introduction

Floor and Table Loading ConsiderationsOnce the final layout for your system laboratory has been developed, the dimensional and weight informationfor t

Seite 12

© 2013 MTS Systems Corporation. All rights reserved.Trademark InformationMTS is a registered trademark and MTS Acumen and MTS Echo are registered trad

Seite 13 - Responsibilities

Note:Local electrical codes supercede any information found here.Customers should use the power cord kit supplied by MTS for connecting electrical pow

Seite 14 - Customer Responsibilities

Electrical DisconnectEnsure that there is access and adequate room behind the frame to allow electrical disconnection of thepower cord. Disconnect the

Seite 15 - MTS Responsibilities

Acumen Test System is not on a line that can be accidentally shut off. It is recommended that the MTSAcumen Test System and the computer workstation a

Seite 16 - Documentation

TemperatureThe operating temperature range of the load frame is 5°C to 40°C (51°F to 104°F). Although the load cell orforce transducer is temperature

Seite 18 - When You Get Your System

System SpecificationsTopics:•Load Frame Dimensions...

Seite 19 - Load Frame Connections

Load Frame DimensionsNote:Specifications subject to change without notice.26 MTS Acumen™ Electrodynamic Test SystemSystem Specifications

Seite 20

Load Frame SpecificationsMTS Acumen 3MTS Acumen 1DescriptionDimension26 mm (1.02 in)26 mm (1.02 in)Minimum test space height1A819 mm (32.24 in)603 mm

Seite 21 - Load Frame Power

MTS Acumen Noise LevelNote:Specifications subject to change without notice.Noise LevelMTS Acumen 3MTS Acumen 1Noise Level47 dbA47 dbATypical769 dbA69

Seite 22 - Acoustics

Electrical connections must be made by qualified personnel and conform to local codes and regulations.Local electrical codes supersede any information

Seite 23 - Relative Humidity

ContentsTechnical Support 5How to Get Technical Support...

Seite 25 - System Specifications

Site Requirements ChecklistTopics:•Site Location...

Seite 26 - Load Frame Dimensions

Site LocationBefore installation of the MTS Acumen system, ensure the final location meets the following requirements.• The floor and table are able t

Seite 27 - MTS Acumen Load Frame Weight

Scheduling InstallationWhen the testing site is ready, contact your authorized MTS representative to schedule an installationappointment:www.mts.com &

Seite 29 - Environmental Requirements

Moving the FrameTopics:•Before You Begin...

Seite 30

Before You BeginBefore moving the load frame, ensure that:• You have suitably trained lifting and moving personnel, qualified to move heavy equipment

Seite 31 - Site Requirements Checklist

5. Remove the fixed wood blocks around the machine.6. Use the packing list to inventory all the boxes. Accessories can be in the container with the lo

Seite 33 - Scheduling Installation

Additional ConsiderationsTopics:•Load Unit Considerations...

Seite 34

Acoustics...

Seite 35 - Moving the Frame

Load Unit ConsiderationsThe load unit is typically shipped in a horizontal position on a pallet or in a crate. Lifting and moving instructionsthat des

Seite 38

Technical SupportHow to Get Technical SupportStart with your manualsThe manuals supplied by MTS provide most of the information you need to use and ma

Seite 39 - Additional Considerations

When you have more than one MTS system, the system job number identifies your system. You can findyour job number in your order paperwork.Example syst

Seite 40 - Load Unit Considerations

If You Contact MTS by PhoneA Call Center agent registers your call before connecting you with a technical support specialist. The agentasks you for yo

Seite 41 - 100-265-565 A

After you callMTS logs and tracks all calls to ensure that you receive assistance for your problem or request. If you havequestions about the status o

Seite 42

PrefaceBefore You BeginSafety first!Before you use your MTS product or system, read and understand the safety information provided with yoursystem. Im

Kommentare zu diesen Handbüchern

Keine Kommentare