Lifting and Moving the Series 322 Load Frame
Prerequisites
You will need the following equipment:
A fork lift or overhead crane capable of lifting the load unit. Ensure that the lifting equipment can
accommodate the weight of the load unit (see the table below)
Lifting slings—not chains—to lift the load unit from its pallet
Lifting chains to tip the load frame upright
Rubber mats for the load unit’s feet to rest on
Wooden blocks for the load unit's columns to rest on
A knife to cut the packing straps
Torque wrenches:
322.21 700 lbf·ft (950 N·m) capacity
322.31 1400 lbf·ft (1900 N·m) capacity
322.41 1400 lbf·ft (1900 N·m) capacity
Molykote G-n paste
Inspect for shipping damage. Look for the following:
Scratches in the load unit or lift cylinder columns
Damaged electrical connections
Damaged hydraulic connections
Dents and other structural damage
Torn, kinked, or breaking hoses
Report any damage found to both the carrier and to MTS. In the U.S. and Canada, call MTS Technical Support
at 1-800-328-2255. Elsewhere, contact your local MTS office.
Series 322 Load Frame Shipping Dimensions and Weights
WeightStandard Dimension PlatenModel
3000 lb (1370 kg)28 x 40 in (711 x 1016 mm)322.21
4500 lb (2050 kg)34 x 40 in (864 x 1016 mm)322.31
8500 lb (3870 kg)42 x 60 in (1067 x 1524 mm)322.41
6 Series 322 Load Frame Lifting and Moving
Lift and Move
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 ... 15 16

Kommentare zu diesen Handbüchern

Keine Kommentare