
MTS Insight™ Material Testing System
66
Routine Maintenance Overview Checklist
Maintenance
Routine Maintenance Overview Checklist
Recommended service to be performed at each running time interval noted
Calendar Time using 8 hour Running Time rate per
day
Daily Weekly Annually
Running Time-Hours 8 40 2000
Shunt Cal Check
X
*
*Symbol denotes services performed by equipment operators. Most of these procedures involve visual checks
that should not interfere with test system operation. These checks are also completed by trained field service
engineers on each Routine Maintenance visit.
Clean Work Area/Machine Surface X
Verify Limits and E-Stop X
Inspect Cable/Connections X
PC Maintenance
Back-up TestWorks files (*.reg/.cal files)
MTS
†
†Symbol denotes service performed by trained field service engineers as part of an MTS Routine Maintenance
plan. Some of these procedures require special service tools and/or specific service training to complete.
HD Defragmentation MTS
System Inspection
Inspect/Clean Controller MTS
Inspect Drive Belts for Excessive Wear MTS
Inspect Cable Connections MTS
System Checks
Check E-Stop MTS
Check Upper Limit MTS
Check Lower Limit MTS
Check Load Cal/Shunt Cal MTS
Lubrication
Crosshead/Ball Screw (#2 white lithium grease) MTS
Bearings in Base Plate (#2 white lithium grease) MTS
Drivetrain Bearings (if applicable) MTS
Frame and Work Area
Clean/Replace Air Filter MTS
Clean Guide Columns with WD40 (D/G/S Series
Frames)
MTS
Clean Off Frame and Work Area MTS
Kommentare zu diesen Handbüchern